The W-1 launcher: pump from 10 m, pull a cord, nothing burns.
A plywood stand holds a short metal pipe. The bottle's mouth sits on an O-ring on the pipe, and a ring of cable ties holds the bottle down by its neck ring. A collar slid over the ties keeps them closed. Pulling the cord from 10 m away drags the collar down, the ties spring open and the rocket goes. Air comes from a foot pump through a launch control panel and a 10 m hose, so nobody is near the rocket while it's under pressure.
Rev B (18 November 2026): the bottle now seals 180 mm above the hub and the post stops 60 mm below that, so nothing touches the bottle or the fins (rev A's mast stood where the bottle would sit). The legs push in without glue, so the launcher comes apart to pack in the base kit.
How it works
- Release: the Clark cable-tie launcher. Cable-tie heads catch the bottle's neck ring, and a ring slid over them keeps them closed; move the ring and they let go[1]. We use a pull cord to move the ring. The bottle seals against an O-ring and is not changed in any way: no cap, no drilling, no glue.
- Why not a garden-hose quick connector? It works for many builders, but it puts a plastic connector in the pressure path. We found no manufacturer rating for those connectors, only shop listings, which gave 6 to 10 bar for different parts, so we couldn't show it meets the rating rule below. The cable-tie release keeps all the plastic out of the pressure path except the bottle and the O-ring.
- The pressure parts are bought, not made. In 2012 a home-built air-pressure launcher used by an educator failed, and NASA withdrew its design and told people to stop using it or its equivalents[2]. W-1's launcher uses only bought, marked, pressure-rated fittings. The plywood only holds them up.
- Rating rule. Launcher parts must be rated for at least 3 times the intended launch pressure[3]. We apply it to the never-exceed pressure: 50 psi × 3 = 150 psi (10.3 bar) for every fitting, the hose, the gauge, the valves and the pipe.
- Relief valve at the launcher, set to 50 psi. A relief device should open above every normal pressure but well below any failure[4]: 50 psi is above our 40 psi launch pressure and is the limit our sources give[5][6]. It sits on the launcher's tee with no valve between it and the bottle, because anything that can shut it off can stop it working[4]. The gauge is how you control the pressure; the relief valve is only the backstop.
- Check valve and dump valve at the operator's end. The pump connects through a tyre valve, which only lets air in. The dump valve lets the operator empty a rocket that didn't launch without walking up to it[3].
- Standing straight. The safety code wants the rocket held within 30 degrees of vertical[3]. W-1 launches vertical, from a stand pegged to the ground at four points.
What to buy
No prices: check them when you buy. Every pressure part must be marked or listed as rated at least 150 psi (10.3 bar) for air. Pick one thread standard (for example 1/4 inch BSP) and buy everything to match.
| Item | Qty | Notes |
|---|---|---|
| Foot pump or track pump with a gauge | 1 | Its gauge is the second check on the panel gauge. |
| Pressure gauge, 0 to 100 psi (0 to 7 bar), for air | 1 | 40 and 50 psi sit mid-scale, which makes them easy to read. Panel hole is a placeholder until it arrives. |
| Tyre (Schrader) valve with a threaded body, the kind sold for compressor tanks | 1 | The pump connection. Its valve core is the check valve. |
| Quarter-turn ball valve for air | 1 | The dump (abort) valve on the panel. |
| Pressure relief (safety) valve for air, 50 psi (3.45 bar) | 1 | Fixed or adjustable. Its real opening pressure is tested before use (section 04). |
| Brass tees and adaptors to suit | 2 tees + adaptors | One tee on the panel, one on the launcher. |
| Air hose with fittings, 10 m | 1 | Sets everyone's distance from the launcher. |
| 15 mm copper pipe, about 330 mm in two pieces, and a 15 mm compression adaptor to your thread | 1 | The lower pipe (tee to coupler) and the launch tube (200 mm, inside the bottle). |
| 15 mm compression straight coupler | 1 | Joins the two pipes 180 mm above the hub. The O-ring sits on its top nut, where the bottle's mouth seals. |
| 15 mm stop end (compression) | 1 | Only for the leak and relief valve tests. |
| O-ring to suit the bottle mouth and the pipe | 2 + spares | Size to check against your bottle's mouth and the pipe. |
| Long cable ties, hose clip | 8 ties + spares, 1 clip | The ties pass through the tie holder; the clip holds them to the pipe. |
| Small compression spring or rubber bands | 1 | Pushes the collar back up over the ties. |
| 15 mm pipe clips and wood screws | 2 | Hold the lower pipe on the post. |
| PTFE thread tape | 1 | Every threaded joint. |
| Braided cord, 3 mm, at least 12 m | 1 | The pull cord, kept on the laser-cut winder. |
| Tent pegs and cord | 4 + 6 | One at each leg end; plus pegs and cord for the 10 m line. |
| Impact-resistant safety glasses | one per person | Everyone at the launch[6]. |
| 3 mm birch plywood | 2 boards | 04_launcher_stand and 06_launcher_parts. |
Step by step
- Cut
04_launcher_standand06_launcher_parts(G-code inw1/out/lasergrbl/). - Head. Glue the three post layers into one 9 mm post (120 mm tall) and glue its tab into the hub. The legs are not glued: slot leg A over leg B at the centre and push their top tabs into the hub. Pull them out again to pack.
- Pipe. Fit the launcher tee just above the hub, with the relief valve pointing sideways and down, away from where anyone stands. The lower pipe runs up from the tee and is clipped to the post 30 and 100 mm above the hub. The compression coupler joins it to the launch tube 180 mm above the hub, 60 mm above the post's top.
- Seal. Slide the O-ring down the launch tube to rest on the coupler's top nut. The bottle's mouth will press onto it; the launch tube goes 200 mm up inside the bottle.
- Cable ties. Glue the two tie holder rings together and slide them onto the lower pipe 45 mm below the seal. Push the 8 ties up through the slots so their heads sit just above the bottle's neck ring when a bottle is on the seal, then clamp them to the pipe with the hose clip.
- Collar. Glue the four collar rings into one. Slide it over the tie heads with the spring under it. Tie the pull cord to both holes, run it down through the guide hole low on the post, and out behind the launcher. Pulled down, the collar stops on the tie holder, above the post.
- Control panel. Fit the gauge, the tyre valve and the dump valve to the panel and plumb them to the panel tee, with the hose connection. Every thread gets PTFE tape.
Before the first launch
Do these with the 10 m hose laid out, glasses on, and everyone at the operator's end, the same as a launch.
- Leak test. Fit the 15 mm stop end on the pipe in place of a bottle. Pump to 40 psi, stop, and watch the gauge for a few minutes from the operator's end. If it falls, open the dump valve, wait for zero, re-tape and tighten the joints, and test again. Don't walk up to look for leaks while it holds pressure.
- Relief valve test. With the stop end on, pump slowly and note the pressure when the relief valve opens. It must open above 40 psi and no higher than 50 psi. If not, adjust or replace it. Repeat three times.
- Dump test. At 40 psi, open the dump valve: the gauge must fall to zero quickly.
- Release test. With an empty, unpressurised bottle on the launcher, pull the cord from 10 m. The ties must open and let the bottle go every time. Then let go of the cord: the collar must spring back up.
Pressure rules
Launch at 40 psi. Never above 50 psi. NASA Glenn: no higher than about 50 psi[5]. The school analysis: 50 psi maximum, and it warns its own launcher "will not prevent over pressurization"[6]; ours has the relief valve as a backstop, but the gauge is the control.
10 m. Nobody within 10 m while the bottle is pressurised (more than the 30 ft in the school analysis[6]). Bystanders 15 m or more[6].
Never stand over the rocket, never lean over the launcher, and never put anything above the bottle[5][6].
Misfire: nobody approaches until the dump valve is open and the gauge reads zero[3]. A pressurised bottle can still go when touched[5].
Only air from a hand or foot pump. No compressor, no gas cylinder, no CO2.
Check every time: O-ring not cracked or flattened, cord not frayed, joints not cracked, bottle not dented or scratched[6].
Sources
Read on 17 November 2026. Where sources disagree, the page says so and takes the more cautious figure.
- [1] Dean Wheeler, BYU, The Clark cable-tie launcher. https://www.et.byu.edu/~wheeler/benchtop/clark.php
- [2] NASA STEM, notice on its withdrawn air-pressure launcher design (failure in 2012). https://www.nasa.gov/stem-content/water-rocket-launcher-directions/
- [3] American Water Rocket Safety Code, revision J (2002), as hosted by Jacob's Rocketry. https://waterrocketmanual.jacobsrocketry.com/safety_code.htm
- [4] Reaction Research Society (2019), Burst discs in liquid rocketry (relief device principles). https://rrs.org/tag/burst-disk/
- [5] NASA Glenn Research Center, Bottle rocket safety. https://www.grc.nasa.gov/WWW/k-12/VirtualAero/BottleRocket/safety.htm
- [6] Montgomery County Public Schools, Job Hazard Analysis: Water Rocket Launch (2016). https://www.montgomeryschoolsmd.org/uploadedFiles/departments/facilities/safety/JHA%20-%20Science%20-%20Water%20Rocket%20061016%20FINAL.pdf