Skip to content
N-1 TVC · In designN-1 TVC build book

N-1 TVC Renders

N-1 TVC, rendered from its design files.

Open the 3D model Rendered from the design files
01The gimbalTwo-axis gimbal for N-1's 29 mm motor, every plywood part exactly as cut: cage cheeks and rings on the motor tube, the middle frame, the fixed plates and bulkhead B1. Steel pins, brass bushings. Shown tilted a few degrees.
02The servo bay, wiredBoth micro servos on their plywood plates with horns, screws and Z-bent pushrods; their brown, red and orange leads tied up the side and through the slots in B2 and B3 to the servo board, the MPU6050 and the board above.
03Full tiltThe gimbal at its full 5 degrees, on the diagonal: the cage and frame both turned, the servo horns swung and the pushrods following them.
04Everything, pulled apartThe gimbal, the bulkheads, both servos with their horns and pushrods, the sled with the board, MPU6050, battery and regulator, and every cable stretched between the levels it joins.
05The gimbal, explodedMotor and cage tube, cage cheeks, rings and pitch horn, the middle frame with its rings, plates and washers, the fixed plates with the yaw pins, and bulkhead B1 that takes the thrust.
06Inside the TVC boosterCut down the middle: the gimbal round the motor at the tail, both servos and their pushrods above it, the cables up through B2 and B3, and the board, MPU6050 and regulator on the sled, with the service port in the tube wall.
07Plus and minus 5 degreesThe same gimbal at both ends of its travel, side by side. Five degrees in any direction is the most the firmware will ever ask for.
08The test rigAll plywood and M5 bolts: N-1 on its balance point in a free two-axis frame, with a stop ring that limits the swing to about 15 degrees. No motor ever goes in the rig; a spent case stands in for it.
09Every laser-cut partThe gimbal, servo bay and fin sheets as they come off the laser, engraving up.

How it goes together

10Step 1: Glue the cageThe cage tube, both cheeks, the front and aft rings, the pitch horn and the thrust cap, with the two gluing jigs holding the cheeks square.
11Step 2: Fit the pins and bushingsBrass bushings pressed into the cheeks, and the frame's two x plates on the pitch pins, glued into the plates only.
12Step 3: Fit the frameThe frame rings, the two yaw plates with their bushings, and the plywood washers.
13Step 4: Mount the platesThe fixed plates on the yaw pins, then bulkheads B1 to B3 and both servo plates.
14Step 5: Fit the servos and pushrodsBoth servos screwed to their plates, horns centred, pushrods Z-bent through the horns and into the gimbal.
15Step 6: Run the wiringThe sled, B4 and the service port; the board, MPU6050, battery and regulator; every cable routed through its slot and tied.
16Step 7: Close up the boosterThe stack slides into the booster tube, the fins go through their slots, and the service port meets its window.
17Step 8: Assemble the rigBase, uprights and swing stop, the two frames on M5 bolts, N-1 clamped at its balance point and the rig plug fitted.