Skip to content
Solace · In buildSolace build book

Guide

Do you need a NOTAM for a model rocket in the UK?

What a NOTAM is, when UKRA says you need one (120 m in the Safety Code, 1500 ft on its NOTAM page), the 28 days notice and what the form asks for.

Concept render of the NOVTAR Solace rocket climbing after launch
Concept render of a Solace climb. NOVTAR Solace is in build and has not flown.

Updated 2026-11-23 ยท 5 min read

What is a NOTAM?

UKRA's NOTAM page (updated 29 July 2025, read 23 November 2026) says NOTAM is short for Notice to Airmen, and that it is issued by the CAA. It tells other air users the place, date and time of activities that may be a hazard, so they can avoid them.

The Safety Code definition adds a limit: a NOTAM is not an entitlement to use or reserve airspace, and fliers must consider other airspace users at all times. UKRA's page says the same thing another way. A NOTAM does not remove your duty under law not to endanger other air users.

When does UKRA say you need one?

Two UKRA pages give two different guide figures, and both are worth knowing.

  • The Safety Code (section 5.5): a NOTAM must be issued if flying may pose a hazard to other airspace users, typically if flights exceed an expected altitude of 120 metres (400 feet) above ground level.
  • The UKRA NOTAM page: a NOTAM will not generally be required for model and low powered rocket flying, because the flights are short. It says there is no hard and fast rule, and suggests asking for one for flights over 1500 feet above ground, for a whole day club event, or for rockets heavier than 7.5 kg. It also says to ask for one if the site is sometimes used by light aircraft, paramotors or ultralights.

1500 feet is about 457 metres (our arithmetic, feet times 0.3048). That is nearly four times the 120 metre figure. We cannot tell you which UKRA means for your launch, so treat the lower Safety Code figure as the careful reading and ask your club's Range Safety Officer (RSO). Our height guide estimates that a rocket the size of NOVTAR Solace would pass 120 metres on common F and G motors, and that the range of estimates straddles 457 metres. Those are our sums for an unflown design, not results.

How far ahead do you have to ask?

The Safety Code says a NOTAM should be submitted to the CAA at least 28 days before the launch session. UKRA's NOTAM page says the same, "ideally 28 days", and says the form has a tick box for when you are giving less than the minimum notice. The Safety Code also says a template NOTAM is on the UKRA website.

How do you apply?

UKRA says it is a simple online form on the CAA portal, and that the process looks harder than it is. Before you start, have these ready:

  1. The activity type.
  2. The start date and end date.
  3. The latitude and longitude of the launch site (UKRA points to gridreferencefinder.com for this).
  4. The closest address to the launch site.
  5. The height above ground you intend to fly to.

The form link and the step by step notes are on UKRA's NOTAM page. We have not filed one ourselves, so we do not describe the form screens.

What else does the Safety Code ask about airspace?

Section 6.2.1 says the flight must not enter controlled airspace except as the CAA Air Navigation Order permits. Fliers must look at aviation charts, controlled airspace and other people's NOTAMs before each flying session. Flying clubs and RSOs should keep those documents to hand for inspection.

Who files it at a club launch?

UKRA says the club normally deals with it. The club picks the site, the dates and the maximum height, and the RSO runs the day. Our club launch guide shows what that looks like, and the launch site guide covers the site rules around it. If you want to fly somewhere else, the garden or park guide explains why that is harder.

What does this mean for NOVTAR Solace?

NOVTAR Solace is in build and has not flown. It will fly only on certified motors at UKRA club launches, where the club has the NOTAM and the RSO makes the final call.

Questions

What is a NOTAM in model rocketry?

A Notice to Airmen filed with the CAA. It tells pilots where and when rockets will be launched so they can keep clear. It is not an entitlement to reserve the airspace, according to the UKRA Safety Code.

Do I need a NOTAM to launch a model rocket in the UK?

The UKRA Safety Code says one must be issued if flying may be a hazard to other airspace users, typically above 120 metres (400 feet). UKRA's NOTAM page says one is not generally needed for model and low powered rockets and suggests 1500 feet as a guide. Ask your club's RSO.

How long before a launch do you apply for a NOTAM?

At least 28 days ahead, says the Safety Code. The online form has a tick box for shorter notice.

What information does the NOTAM form need?

Per UKRA: the activity type, start and end dates, latitude and longitude of the site, the closest address and the height above ground you plan to fly to.

Who files the NOTAM at a UKRA club launch?

UKRA says the club normally deals with it.

Is this legal advice?

No. It summarises two UKRA pages. UKRA and the CAA are the authorities, and your club's RSO decides on the day.

Next steps

Read the originals: UKRA Safety Code and UKRA, CAA NOTAM Procedures.