Skip to content
Solace · In buildSolace build book

Launch Link

Every part of the launch, linked.

Mission Control, the ground station, the drum and the rocket, working as one. Mission Control runs the checks and the countdown and launches; a person holds it, and the safety key and the drum's own timers stop it. Tested in simulation only.

Tested in simulationNot yet builtA person holds launch

The system

Five parts, one sequence.

Mission Control on the laptop, the ground station on its USB-C lead, the drum, the pad lights and Solace with its flight computer. Click any part, or play the sequence.

LAUNCH LINKClick any part to see what it does.
IllustrationUSB-CheartbeatESP-NOWevery 200 msWiredin the boxLoRa 869.525 MHz · telemetry twice a secondShort igniter leadthe only firing pathMCMission ControlThe laptopGSGround stationHeltec V3 on USB-CPBIgnis pad boxKey, ARM and FIREPADPad lightsOn the pad's legsSolaceThe rocketFlight computer insideUSB-CESP-NOWWiredLoRa 869.525 MHzShort igniter leadMCMission ControlThe laptopGSGround stationHeltec V3 on USB-CPBIgnis pad boxKey, ARM and FIREPADPad lightsOn the pad's legsSolaceThe rocketFlight computer inside
Try it in Mission Control The sequence above is an illustration. Mission Control runs the real logic, in Simulation.

The sequence

From checks to the hold.

  1. ChecksEvery line greenThe rocket's sensors, logging and battery, every radio link, the arming plug in, continuity, both relays open, plus RSO says GO, range clear and the wind (the RSO's call).
  2. GOA person presses GOGO FOR LAUNCH only works when everything is green. It starts the countdown; it can't fire anything.
  3. CountdownT-10 everywhereMission Control and the pad lights count down together. Any red check, the key out or a radio going quiet stops it.
  4. WindowT-0 to T+30 sThe drum closes ARM. A person holds Hold to launch: FIRE closes while they hold it, 3 s at most. Nothing held in 30 s: the permit runs out.
  5. Hold3 minutesAfter any firing, nobody goes to the pad for three minutes (UKRA, for an F or G motor).

The rule

Mission Control launches, a person holds it, and hardware the software can't reach stops it.

Firing battery→Fuse→Arming plug (a person)→ARM relay (launch window)→FIRE relay (while a person holds launch)→Short lead→Igniter

Since 19 November there is no hand-held launch controller. The firing loop is all in the drum under the pad’s hub: the arming plug, then two normally open relays in series. The plug is a person’s and no board can close it. ARM closes only in the launch window the drum watched count down itself; FIRE only while a person holds Hold to launch in Mission Control, and the drum opens it on its own timers if the messages stop. Any one of these opens the relays at once:

Letting go of Hold to launch (FIRE opens within 300 ms)
ABORT in Mission Control
Any check turning red
The safety key coming out
Mission Control's heartbeat stopping for 600 ms
No permit from the ground station for 600 ms
30 s after T-0 with nothing held
3 s of firing (our cap)
A relay that reads stuck or slow
The drum losing power

At a club launch the RSO decides. If the club uses its own launch system, our drum stays switched off with the plug out and Mission Control runs only the rocket checks and a countdown, sending nothing. Nimbus’s pull-cord launcher stays manual.

In Mission Control

The Launch card, in Simulation.

Screenshots taken in Simulation mode: a simulated kit that copies the firmware's logic, so the whole sequence can be tried with no hardware.

NOVTAR Mission Control in Simulation mode: every check green: go for launch is allowed
Every check green: GO FOR LAUNCH is allowedSimulation. Not a real launch
NOVTAR Mission Control in Simulation mode: the countdown fills the screen
The countdown fills the screenSimulation. Not a real launch
NOVTAR Mission Control in Simulation mode: t-0: launch window open
T-0: launch window openSimulation. Not a real launch
NOVTAR Mission Control in Simulation mode: after launch: the simulated n-1 flies
After launch: the simulated Solace fliesSimulation. Not a real launch

Where it stands

Tested in simulation. Not built yet.

  • Done: the drum and ground station firmware, the Launch card with Hold to launch in Mission Control, and the drum in the Harbour's design, laser files, 3D model and build book.
  • Tested: in Simulation only, against a simulated kit that copies the firmware's logic.
  • Not tested on hardware: none of it is built yet. The build book has bulb tests to do first, never with an igniter fitted.
  • Radio lock (version 4, 20 November): the drum and its ground station are paired with a shared key, and every message is signed. The drum ignores anything else, so a stranger’s radio, another kit on the field or a recording of an earlier launch can’t start a countdown. Tested by compiling both boards’ firmware and in Simulation.
  • Smart pad (version 4): the drum reports the rail’s tilt and the firing battery’s voltage. They can only hold a launch: a rail tilted past 20 degrees (the angle our exhaust check covers) is NO-GO; the wind is the RSO’s call. Nothing a sensor reads can start one.
  • Every board runs the same link version (version 4), so the drum and the ground station are flashed together.